OSU SeaGlider No.SG686

SG685 transets
Based on high voltage usage over previous 3 dives:
    dives remaining   : 3100 (65.7 days at current dive duration)
    projected end date: 31-May-2024 16:12:29 (to 5% capacity)

dive end time
(UT)
length
(min)
depth
(meters)
lat lon dog
(km)
cog dtw
(km)
ctw dtg
(km)
ctg Umag
(cm/s)
Udir dive climb high V low V errors retries
 pitch rollL rollR  pitch rollL rollR volts kJ % cap volts kJ % cap TT8 CF8 pit rol VBD pit rol VBD
10 l c24/03/27 00:16 26 60.40(60.00) 44 33.44 -123 17.05 0.00270.0 0.00 15.6424.7204.2 0.3160.40 -15.6 1 0 20.0 0 115.2 9.099.215.0 1.0 NaN 0 0 0 0 0 0 0 0
9 l c24/03/26 23:45 26 60.10(60.00) 44 33.44 -123 17.05 0.00 90.0 0.00 15.6424.7204.2 0.235.40 -15.6 1 0 20.0 0 115.1 8.099.215.0 1.0 NaN 0 0 0 0 0 0 0 0
8 l c24/03/26 23:14 26 60.20(60.00) 44 33.44 -123 17.05 0.00 90.0 0.00 15.6424.7204.2 0.5334.60 -15.6 1 0 20.0 0 115.1 8.099.215.0 1.0 NaN 0 0 0 0 0 0 0 0